    11= Project Phases
    22
    3 Project work is done in phases and iterations. Each phase/iteration has to be presented to the teacher during consultation and has to be approved before continuing with the next phases/iterations. If a phase/iteration is not done to a satisfactory level, the team will be instructed to improve their work and present once again for approval.
     3Project work is done in phases and iterations. Each phase/iteration has to be presented to the teacher during consultations and has to be approved before continuing with the next phases/iterations. If a phase/iteration is not done to a satisfactory level, the team will be instructed to improve their work and present once again for approval.
    44
    55== Phase 1
    6 
    7 Iterations
    86
    97* P1-I1. Inception of the project idea (BusinessCase, ProjectVision)