Changes between Initial Version and Version 1 of WikiStart


Ignore:
Timestamp:
04/18/26 18:41:05 (6 weeks ago)
Author:
231088
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WikiStart

    v1 v1  
     1= Project Phases
     2
     3Project work is done in phases and iterations. Each phase/iteration has to be presented to the assistants coordinating your laboratory class and has to be approved before continuation with the following phases/iterations. If a phase/iteration is not done to a satisfactory level, the team will be instructed to improve their work and present once again for approval.
     4
     5Each project phase, iteration and milestone lists the names of the pages that document the respective types of activities in each phase. Create wiki pages in your project site that correspond to these names. As an Example: to document the activity !AboutProject, create a wiki page named **!AboutProject**.
     6
     7Before starting the working on the project, the project team and project idea must be proposed officially via the EPRMS and approved by the assistants coordinating your laboratory class. See [[StartingProjects]].
     8
     9**Project phases P0-P4 are mandatory** and must be developed in the same order. **Project phase P5 is elective**. All phases contribute to your final points and grade.
     10
     11== Phase P0: !AboutProject
     12
     13Describe the project and initial data requirements.
     14
     15See: [[InstructionsP0]]
     16
     17== Phase P1: !RelationalModel
     18
     19Create a detailed model of the data requirements as a Relational Model.
     20
     21See: [[InstructionsP1]]
     22
     23  * Deadline: 01.04.2026
     24
     25== Phase P2: !DatabaseCreation
     26
     27Implement the database structure from P1 as a relational database schema in the assigned PostgreSQL database at the Faculty premises, using SQL DDL and DML scripts.
     28
     29See: [[InstructionsP2]]
     30
     31  * Deadline DDL: 15.04.2026
     32  * Deadline DML: 22.04.2026
     33
     34
     35== Phase P3: !QueryOptimization
     36
     37...
     38
     39See: [[InstructionsP3]]
     40
     41  * Deadline: 29.04.2026
     42
     43
     44== Phase P4: !DatabaseProgramming
     45
     46...
     47
     48See: [[InstructionsP4]]
     49
     50  * Deadline: 13.05.2026
     51
     52
     53
     54== Phase P5: !AdvancedTopics
     55
     56...
     57
     58See: [[InstructionsP5]]
     59
     60  * Deadline: 01.06.2026
     61