Project Phases

Project work is done in phases and iterations. Each phase/iteration has to be presented to the teacher during consultations and has to be approved before continuation with the following phases/iterations. If a phase/iteration is not done to a satisfactory level, the team will be instructed to improve their work and present once again for approval.

Each project phase, iteration and milestone lists the names of the pages that document the respective types of activities in each phase. Create wiki pages in your project site that correspond to these names. As an Example: to document the activity ProjectVision, create a wiki page named ProjectVision.

Before starting the working on the project, the project idea must be proposed officially via the EPRMS and approved by the teacher. See StartingProjects.

Phase P0: Initial phase - selection of a database management system according to your wishes and interests, installation in an agreed manner, setting up a given relational database in the system and entering given data into the database

See: InstructionsP0

Milestone M1: Initial Database is setup

  • Present the starting database instance for the project purposes
  • Deadline: January 2026

See: InstructionsM1

Phase P1: Administration from the aspect of organizing data storage within the system, reviewing available capabilities in the selected system and implementing them in the most appropriate way possible for the specific database

See: InstructionsP1

Phase P2: Administration of operational elements from the aspect of concurrency, transactions, memory and caches - reviewing available capabilities in the selected system and implementing them in the most appropriate way possible for the specific database

See: InstructionsP2

Phase P3: Administration of system maintenance operations, backups and recovery in case of an exam - reviewing available capabilities in the selected system and implementing them in the most appropriate way possible for the specific database

See: InstructionsP3

Phase P4: Administration from the aspect of performance monitoring, performance analysis and performance optimization - reviewing available capabilities in the selected system and implementing them in the most appropriate way possible for the specific database data

See: InstructionsP4

Milestone M2: Presentation of the final version of the project

  • Present the finished project and documentation.
  • Deadlines:
    • Deadline: 01.02.2026 to get a grade in January/February exam session.
    • Deadline: 15.06.2026 to get a grade in June exam session.
    • Deadline: 01.09.2026 to get a grade in August/September exam session.